As TOPWERK LANGFANG, we are pleased to share that our client has supplied the sleepers for the railway line between Hangzhou and Nanchang.
This line is a part of the recently completed 560 km high-speed line connecting Zhejiang Province with Jiangxi Province. As of December 27, CHINA Railway brought 288 km of this high-speed infrastructure into service.
Up to 32 daily trains are running during the initial phase of operations. This high-speed line enhances travel efficiency with speeds up to 350 km/h and reduces travel time between Huangshan and Nanchang to just 1 hour and 45 minutes.
This project significantly improves the connections between key cities and tourist locations in Zhejiang, Anhui, and Jiangxi while strengthening regional transportation infrastructure.